COMMERCIAL
Every commercial project has its own challenges, requirements and opportunities. At MAS Design Consultants, we bring extensive experience across a diverse range of commercial sectors, including hospitality, leisure, veterinary, retail, offices, industrial, agricultural and specialist facilities. From the conversion and fit-out of existing buildings to the design of new developments, we combine practical thinking, technical expertise and considered design to create spaces that work for both our clients and their businesses.
GREEN ROOM, LEEDS
Conversion and refurbishment of the listed 34–36 Wellington Street in Leeds, bringing the two properties together to create The Green Room, a vibrant bar and entertainment venue in the heart of the city.
RICHMOND HOUSE, MIRFIELD
Conversion of three vacant commercial units into a purpose-designed veterinary practice, providing dedicated consultation rooms, animal wards, diagnostic facilities and specialist treatment spaces for a modern veterinary service.
DARIO’S RISTORANTE, DONCASTER
Extension of the existing Owston Inn to provide additional hotel accommodation, seamlessly integrating the new facilities with the character of the original building while enhancing the overall guest offering.
WRIGHTON & MORTON, MACCLESFIELD
MAS Design Consultants Ltd. successfully delivered the conversion of an existing commercial building in Macclesfield into a modern veterinary practice, including the full architectural design and internal fit-out.
LEATHLEY VILLAGE HALL
A well-used local village hall was in need of some much needed improvements to bring it more up-todate. The changes included providing a new meeting room and main hall with upgraded kitchen facilities
TOWER HOUSE LANE, HULL
The redevelopment of an existing industrial site with a new build warehouse unit approximately 2400m square. The proposal also included the addition of a further thirteen light industrial starter units at approx. 200m square each.
ROSSET SCHOOL, HARROGATE
Working alongside the school we developed a submission package for a bid for Capital Maintenance Funding Grant in 2012. The design included the removal of four existing temporary classrooms and their replacement with a new single storey classroom block.